{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreigqzhsy2gpoledkn3fref7od3myr223t5vb3bqmbaonq4mwwxkbpe",
    "uri": "at://did:plc:yvpkwzscqadwgkjjwcpe36s2/app.bsky.feed.post/3mj2f7ehihlc2"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreifjjuf4tt6vn67zatbl5dt6uamcla2z3ig7rvileqb3rqijyzkslm"
    },
    "mimeType": "image/jpeg",
    "size": 163563
  },
  "path": "/2026/04/09/mumbai-metro-line-14-dpr-finalisation-underway-aiming-to-be-citys-longest-corridor/",
  "publishedAt": "2026-04-09T07:25:12.000Z",
  "site": "https://thechenabtimes.com",
  "tags": [
    "Maharashtra",
    "Mumbai",
    "Kanjurmarg to Badlapur Metro",
    "Metro Rail Projects",
    "MMRDA",
    "Mumbai infrastructure",
    "Mumbai Metro Line 14"
  ],
  "textContent": "The Mumbai Metropolitan Region Development Authority (MMRDA) has begun the process for the Detailed Project Report (DPR) of Metro Line 14, a proposed 43.69 km corridor connecting Kanjurmarg to Badlapur. This line is expected to become one of Mumbai's longest metro routes.",
  "title": "Mumbai Metro Line 14 DPR Finalisation Underway, Aiming to Be City’s Longest Corridor"
}