{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreidptca5g55jryckosx2fx2pcsmji2cxpjwc7cgx64izmyszgcqlp4",
    "uri": "at://did:plc:ylpyexe76drremkckc44jtvo/app.bsky.feed.post/3mjjy6ovnp422"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreiaxyjtg6godngqtn2kdbjxeupafka4dnchzbuynpc4hla26ygmoym"
    },
    "mimeType": "image/jpeg",
    "size": 420728
  },
  "path": "/2026/04/14/vision-980-highway-phase-two-competition-oakland-removal-community/",
  "publishedAt": "2026-04-14T19:55:15.000Z",
  "site": "https://oaklandside.org",
  "tags": [
    "Mass Transit",
    "Road Safety",
    "Roads & Transit",
    "California",
    "Caltrans",
    "federal government",
    "I-980",
    "Oakland's dangerous roadways",
    "Public safety",
    "Traffic safety",
    "west oakland",
    "West Oakland Environmental Indicators Project",
    "Vision I-980: architects and engineers compete to design the future of the highway"
  ],
  "textContent": "## Vision I-980: architects and engineers compete to design the future of the highway\n\nThe multiyear project, which could result in the highway’s demolition, has hit phase two, with a design firm competition. Proposals are due today, with an announcement expected in May.",
  "title": "Vision I-980: architects and engineers compete to design the future of the highway"
}