Week 2: A Man, A Plan

brett g porter February 14, 2016
Source

in the wet wall { .img-caption }

Not a ton of visible change this week. The skeleton of the wall that used to divide the kitchen and dining room is gone, so you can now get a feeling for this as a single room:


IMG_2385 { .img-caption }

Some plumbing demo was done while I was in Pasadena for work, and we've put down deposits on the cabinetry and ordered the bathroom fixtures. I'll be happy to start writing more checks for things that I want added, not to have people wreck stuff and leave my house a mess. I can do that myself.

Here's what we're building:


IMG_2388 { .img-caption }

You can see the dashed line that used to be the wall between the kitchen (on the right) and dining room. A huge (11 ft. long) island is in the center of the room. It breaks into two pieces; the right half has a prep sink, storage, and microwave, and the left half is on wheels and functions more as a table.

At the bottom, what the architect calls the 'hot wall' -- range, countertops/cabinets, and a built-in bookshelf.


IMG_2390 { .img-caption }

On the right, the 'wet wall' -- main sink, fridge, dishwasher, pantry. The pantry on the left will have stainless steel panels in it to match the fridge, and to look like a Shaker style pie safe.


Neo is behind here someplace. { .img-caption }

Looking from the wet wall to the north:


IMG_2391 { .img-caption }

...and from the stove out the door toward the East:


IMG_2389 { .img-caption }

This week: hoping to see some actual construction.

Backlinks: {#backlinks}

  • Renovation 2016

View Change History

Discussion in the ATmosphere

Loading comments...