{
  "$type": "site.standard.document",
  "canonicalUrl": "https://bgporter.net/posts/renovation2016/renovation-week-30-appendix-cd",
  "description": "As close to completion as we can be without getting there.",
  "path": "/posts/renovation2016/renovation-week-30-appendix-cd",
  "publishedAt": "2016-08-29T00:00:00.000Z",
  "site": "at://did:plc:ydw7775jx6d3kfm3ve36kps2/site.standard.publication/3mp2v5rzhhp2h",
  "tags": [
    "renovation"
  ],
  "textContent": "Yes, we skipped the entry for Week #29, partly because of my issue with seeing another prime-numbered number of weeks on this project, and partly because very little happened that week -- the cabinet-maker adjusted some drawers and installed (but did not electrically connect) the LED under-cabinet lights.\n\n\n\nWeek 30 {#week-30}\n\nThe backsplash tile was installed, but not grouted yet.\n\n<br />\nBacksplash tile installation\n{ .img-caption }\n\n...and the under-cabinet LED lights were all wired up and verified working.\n\nWe're going through final touchup issues with the contractor this week (grouting, replacing the moldings that were removed before the new dining room floor was installed, touchup paint, etc.).\n\nThese final issues aside, we're completely living in the new kitchen and dining room, and it's pretty great.\n\nThings are almost complete for real.\n\nBacklinks: {#backlinks}\n\n- Renovation 2016\n\nBacklinks: {#backlinks}\n\n- Week 19: Final Prime?\n- Week 23: Primal Scream\n\n<small>View Change History</small>",
  "title": "Week 30: appendix c&d"
}