{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreiezpxp7th7ly642vch6yffoesna6fhz2qppdc7jlgwykouhgon654",
    "uri": "at://did:plc:ujylxtykl6dg4ui7fzagqv3a/app.bsky.feed.post/3milwox2cp3w2"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreicspeqt3okifldvftau6yxj7thjxung7i35zpv4lhfe4fx2tzgjyq"
    },
    "mimeType": "image/png",
    "size": 81659
  },
  "description": "Multiple construction projects are impacting travel in Glenwood Springs this April, including lane closures on Hwy 6 & 24, Airport Road delays, and I-70 restrictions through Glenwood Canyon. Drivers should expect detours, reduced speeds, and longer travel times.",
  "path": "/glenwood-springs-road-and-construction-updates-april-2026/",
  "publishedAt": "2026-04-03T14:30:35.000Z",
  "site": "https://www.westernslopetrellis.com",
  "textContent": "Drivers and residents in Glenwood Springs should expect a mix of lane closures, detours, and seasonal construction activity across several key corridors this month. Projects range from local utility work to major highway impacts through Glenwood Canyon.\n\n* * *\n\n## Hwy 6 & 24: Shared Use Path Closure and Lane Impacts\n\nThe shared-use path along Highway 6 & 24 is closed between Donegan Road and Linden Street through August 31, 2026 as crews work on a new path and utility upgrades.\n\nMotorists should expect:\n\n  * Lane closures\n  * Reduced speed limits of 25 mph\n  * Ongoing construction activity in the corridor\n\n\n\nTransit riders should note:\n\n  * The westbound Ride Glenwood Traver Trail stop has been temporarily relocated to W. 1st Street near the Antlers Hotel\n  * Eastbound stop remains unchanged\n\n\n\n* * *\n\n## Airport Road: Lane Closures Beginning Week of April 7\n\nConstruction to replace aging natural gas mains is underway along Airport Road south of Morgan Street.\n\n  * Two lanes remain open through the weekend\n  * Beginning Monday, expect lane closures with stop-and-go traffic control\n  * Work hours are 7 a.m. to 7 p.m.\n  * Project expected to wrap up by mid-April\n\n\n\n* * *\n\n## I-70 Glenwood Canyon: Lane Reductions and Ramp Closures\n\nCDOT crews have resumed work on bridge joint improvements throughout Glenwood Canyon, impacting travel along a 17-mile stretch between Glenwood Springs and Dotsero.\n\nKey impacts include:\n\n  * Eastbound and westbound I-70 reduced to one lane in work zones\n  * Speed limits reduced to 35 mph\n  * Width restrictions of 11 feet in place for large vehicles\n\n\n\nUpcoming ramp closures:\n\n  * Shoshone off-ramp and Hanging Lake Trail off-ramp will close April 6 for paving\n  * Both ramps are expected to reopen by the morning of April 7\n\n\n\nDrivers should plan for delays, especially during peak travel times.\n\n* * *\n\n## Glenwood Canyon Recreation Path: Partial Closure\n\nThe recreation path through Glenwood Canyon is partially open:\n\n  * Glenwood Springs to Shoshone Power Plant: open\n  * Shoshone to Bair Ranch: closed\n\n\n\nThe full corridor is expected to reopen within the next two weeks as final repairs and safety improvements are completed.\n\n* * *\n\n## Downtown Glenwood: Parking Garage Closure\n\nThe 9th and Cooper Parking Garage will have a partial closure on April 3 starting at 10 a.m.\n\n  * South side of the garage will be closed for HVAC maintenance\n  * Lower level entrance will remain open\n\n\n\n* * *\n\n## Looking Ahead: Coach Miller Drive Project\n\nA larger construction project on Coach Miller Drive is scheduled for summer 2026, running from June 4 through September 1.\n\nThe City of Glenwood Springs will host two public meetings for residents:\n\n  * April 20 at 6 p.m. in person at Glenwood Springs High School\n  * April 28 at noon via online webinar\n\n\n\n* * *\n\n## What to Expect Across the Area\n\n  * Ongoing lane closures and reduced speeds\n  * Temporary detours and relocated transit stops\n  * Increased travel times, especially through Glenwood Canyon\n\n\n\nDrivers, cyclists, and pedestrians are encouraged to follow posted signage and use caution in active work zones.\n\n* * *\n\n## Stay Updated\n\nResidents can sign up for emergency and construction alerts through Garfield County and the City of Glenwood Springs to receive real-time updates on road conditions and closures.\n\n* * *",
  "title": "Glenwood Springs Road and Construction Updates: April 2026",
  "updatedAt": "2026-04-03T14:30:36.201Z"
}