{
"$type": "site.standard.document",
"bskyPostRef": {
"cid": "bafyreieskzfp5mb6cwrjlwzphuglzfxsuldbhcasd2fhol44ctp7jlzedy",
"uri": "at://did:plc:tr4cib3u27qz5ltiassjlr7b/app.bsky.feed.post/3mjqsgaksvpx2"
},
"coverImage": {
"$type": "blob",
"ref": {
"$link": "bafkreicf3kl6fwh7izuca2askytr6csuydafpl3zbsbi7rhzsf4xtzv6wq"
},
"mimeType": "image/jpeg",
"size": 164298
},
"path": "/community/2026/04/medina-must-survey-untitled-land-before-moving-forward-on-bridge-replacement.html",
"publishedAt": "2026-04-18T05:07:28.000Z",
"site": "https://www.cleveland.com",
"textContent": "While most of the property easements required to move forward with the South Huntington Street bridge replacement project have been obtained, the city still needs to take action on a stretch of land near the bridge that doesn’t appear to have an owner.",
"title": "Medina must survey untitled land before moving forward on bridge replacement"
}