{
  "$type": "site.standard.document",
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreignuxw4ayovvsxz52k7yzx27s6uor4d5krq47gypc4o74rfqa627a"
    },
    "mimeType": "image/jpeg",
    "size": 479939
  },
  "path": "/news/ann-arbor/2026/02/5m-project-to-replace-border-to-border-trail-bridge-over-huron-river-in-ann-arbor.html",
  "publishedAt": "2026-02-05T16:25:24.000Z",
  "site": "https://www.mlive.com",
  "textContent": "The bridge has reached the end of its useful life and needs to be replaced with a new structure, according to the city.",
  "title": "$5M project to replace Border-to-Border Trail bridge over Huron River in Ann Arbor"
}