"$type": "site.standard.document",
"description": "A central plant includes storage devices configured to store resources purchased from a utility or generated by the central plant and to discharge the one or more resources. The central plant includes a controller configured to obtain a cost function comprising a peak load contribution (PLC) term…",
"path": "/patents/1246640",
"publishedAt": "2019-10-24T00:00:00.000Z",
"site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
"tags": [
"G05F1/66",
"Johnson Controls Technology Company"
],
"textContent": "A central plant includes storage devices configured to store resources purchased from a utility or generated by the central plant and to discharge the one or more resources. The central plant includes a controller configured to obtain a cost function comprising a peak load contribution (PLC) term representing a cost based on an amount of the one or more resources purchased during coincidental peak (CP) subperiods. The controller is configured to modify the cost function by applying a peak subperiods mask to the PLC term, wherein, for each subperiod, the peak subperiods mask modifies a portion of the PLC term corresponding to the subperiod based on a probability that the subperiod will be one of the CP subperiods. The controller is also configured to perform an optimization of the modified cost function.",
"title": "BUILDING ENERGY STORAGE SYSTEM WITH PEAK LOAD CONTRIBUTION AND STOCHASTIC COST OPTIMIZATION"
}