MANAGEMENT METHOD AND MANAGEMENT APPARATUS
DRIVE
June 11, 2020
A management method includes a step A of estimating, for each of the plurality of entities, an error pattern related to a prediction error occurring when a power consumption amount in a future period is predicted; and a step B of determining a group of entities from among the plurality of entities based on the error pattern, wherein the group is a destination of a power reduction request for reducing the power consumption amount. The step A includes a step of estimating whether the prediction error is a positive error or a negative error. The step B includes a step of determining the group such that a total prediction error of the group is minimized, by combining an entity of which the prediction error is estimated to be a positive error and an entity of which the prediction error is estimated to be a negative error.
Discussion in the ATmosphere