{
  "$type": "site.standard.document",
  "description": "A micro-grid system for providing power to a load includes a plurality of gensets and energy storage units (ESU) in parallel. An asset management controller is configured to determine a genset cost function for the gensets based on at least an efficient load factor, and determine an ESU cost…",
  "path": "/patents/1272742",
  "publishedAt": "2020-09-24T00:00:00.000Z",
  "site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
  "tags": [
    "G05B19/042",
    "Caterpillar Inc."
  ],
  "textContent": "A micro-grid system for providing power to a load includes a plurality of gensets and energy storage units (ESU) in parallel. An asset management controller is configured to determine a genset cost function for the gensets based on at least an efficient load factor, and determine an ESU cost function based on at least the a discharge power loss (DPL) and a charge power loss (CPL). The AMC assigns a priority to each ESU and each genset based on the cost function and selectively activates the power supplies based on the priority and a power demand of the load and a reserve. The AMC determines an available reserve among activated power supplies then selectively distributes the load among activated power supplies and reserve among the available reserve.",
  "title": "ENERGY MANAGEMENT SYSTEM WITH GENSETS AND ENERGY STORAGE"
}