{
"$type": "site.standard.document",
"description": "An insulation verification system for a motor vehicle provided with a high-voltage battery connected to a high-voltage bus is described, involving: a first insulation monitoring device, arranged inside the high-voltage battery, and managed and controlled by a corresponding BMS management module of…",
"path": "/patents/1426723",
"publishedAt": "2026-06-25T00:00:00.000Z",
"site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
"tags": [
"H01M10/48",
"FERRARI S.P.A."
],
"textContent": "An insulation verification system for a motor vehicle provided with a high-voltage battery connected to a high-voltage bus is described, involving: a first insulation monitoring device, arranged inside the high-voltage battery, and managed and controlled by a corresponding BMS management module of the high-voltage battery; a second insulation monitoring device, arranged outside the high-voltage battery; an insulation control unit, external to the high-voltage battery and operatively coupled to the second insulation monitoring device to manage its operation. The insulation control unit implements a control logic of the insulation verification system for verification of the electrical insulation of the high-voltage bus involving an interaction, with cooperation without mutual interference, between the first and second insulation monitoring devices.",
"title": "SYSTEM FOR VERIFICATION OF ELECTRICAL INSULATION IN A MOTOR VEHICLE PROVIDED WITH A HIGH-VOLTAGE BATTERY"
}