PEAK DEMAND RESPONSE OPERATION OF HVAC SYSTEMS
DRIVE
February 18, 2021
An HVAC system includes a variable-speed compressor which compresses refrigerant flowing through the HVAC system, a blower which provides a flow of air through the HVAC system at a controllable flow rate, and a controller communicatively coupled to the variable-speed compressor and the blower. The controller receives a demand request, which includes a command to operate the HVAC system at a predefined setpoint temperature. In response to receiving the demand request, a setpoint temperature associated with the HVAC system is adjusted to the predefined setpoint temperature. A speed of the variable-speed compressor is decreased to a low-speed setting. Based on the decreased speed of the variable-speed compressor, an air-flow rate is determined to provide by the blower. The controllable flow rate of the flow of air provided by the blower is adjusted based on the determined air-flow rate.
Discussion in the ATmosphere