{
"$type": "site.standard.document",
"coverImage": {
"$type": "blob",
"ref": {
"$link": "bafkreicwffviwbh2pxzbzrhd43dbqdujlhguqzkzul7dyah25ev3n3qmiq"
},
"mimeType": "image/png",
"size": 117266
},
"description": "A method for state estimation of a distribution network comprises: (a) obtaining measurements from phasor measurement units (PMUs) placed at buses in the distribution network; (b) constructing a quotient gradient system (QGS) based on a constraint set H that relates the measurements to stateā¦",
"path": "/patents/1286257",
"publishedAt": "2021-03-18T00:00:00.000Z",
"site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
"tags": [
"H02J3/003",
"Bigwood Technology, Inc."
],
"textContent": "A method for state estimation of a distribution network comprises: (a) obtaining measurements from phasor measurement units (PMUs) placed at buses in the distribution network; (b) constructing a quotient gradient system (QGS) based on a constraint set H that relates the measurements to state variables of the distribution network; (c) integrating the QGS to reach a steady state; (d) identifying one or more of the state variables whose measurement residuals violate a measurement residual constraint in the constraint set H; (e) integrating a reconstructed QGS, which is reconstructed based on the constraint set H by setting the identified one or more state variables to values of corresponding PMU measurements; (f) iterating steps of (d) and (e) until no measurement residuals violate the measurement residual constraint, to thereby obtain the state estimation; and (g) reporting the state estimation to a control system during real-time monitoring of the distribution network.",
"title": "OPTIMAL SPARSE PLACEMENT OF PHASOR MEASUREMENT UNITS AND STATE ESTIMATION OF KEY BUSES IN DISTRIBUTION NETWORKS"
}