{
"$type": "site.standard.document",
"coverImage": {
"$type": "blob",
"ref": {
"$link": "bafkreiaqv5bzr3adnrheu6avgq6iio4msnpqvyxbojedu2hjo3eu3ogs6i"
},
"mimeType": "image/png",
"size": 107984
},
"description": "An operator's cab arrangement for a construction machine (100) is proposed which comprises side wall elements, a front wall element, a rear wall element and a roof element (4). At least one of said side wall elements is closable by a door element (1) which is pivotably mounted to said arrangement…",
"path": "/patents/935306",
"publishedAt": "2016-11-02T00:00:00.000Z",
"site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
"tags": [
"B62D33/0617",
"GUANGXI LIUGONG MACHINERY CO [CN]"
],
"textContent": "An operator's cab arrangement for a construction machine (100) is proposed which comprises side wall elements, a front wall element, a rear wall element and a roof element (4). At least one of said side wall elements is closable by a door element (1) which is pivotably mounted to said arrangement with a pivot axis being substantially vertical with respect to said construction machine (100). Said door element (1) is inclined towards a central axis of said construction machine when closed.",
"title": "OPERATOR'S CAB ARRANGEMENT FOR A CONSTRUCTION MACHINE"
}