{
"$type": "site.standard.document",
"description": "There is provided a load controller for a system, the system comprising a first sub-system arranged to deliver a first load, the load controller being operable to: acquire a first target load profile, being the load initially desired for delivery by the first sub-system over an operational period…",
"path": "/patents/1292508",
"publishedAt": "2021-06-10T00:00:00.000Z",
"site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
"tags": [
"G05B13/048",
"BAE Systems plc"
],
"textContent": "There is provided a load controller for a system, the system comprising a first sub-system arranged to deliver a first load, the load controller being operable to: acquire a first target load profile, being the load initially desired for delivery by the first sub-system over an operational period; measure in real time during an update window within the operational period: a first parameter of the first sub-system, to obtain a first measured Load Controller monitor signal; and the first load, to obtain a first measured load signal; develop in real time a model of the first sub-system, using the first measured monitor signal and the first measured load signal, the model relating the first load to the first parameter; given the first target load profile, and the model of the first sub-system, generate for a future period a first predicted monitor signal, the future period being ahead of the update window; and determine whether the first predicted monitor signal satisfies at least one predetermined criterion.",
"title": "LOAD CONTROLLER"
}