{
"$type": "site.standard.document",
"description": "A method for controlling a wind power installation, comprising the following steps: measuring a grid voltage of an electrical power supply grid, setting a DC-link voltage at a converter of the wind power installation depending on the measured grid voltage and using a first time constant and a…",
"path": "/patents/1295326",
"publishedAt": "2021-07-15T00:00:00.000Z",
"site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
"tags": [
"F03D7/0284",
"Wobben Properties GmbH"
],
"textContent": "A method for controlling a wind power installation, comprising the following steps: measuring a grid voltage of an electrical power supply grid, setting a DC-link voltage at a converter of the wind power installation depending on the measured grid voltage and using a first time constant and a second time constant, wherein the first time constant is different than the second time constant.",
"title": "METHOD FOR CONTROLLING A WIND POWER INSTALLATION"
}