VERIFIED HIGH-POWER TRANSITION AND FAST CHARGING WITH PRE-BOOT SCALING

DRIVE March 18, 2026
Source
Systems, apparatuses and methods may provide for technology that initiates a boot of a computing system containing an embedded controller while the computing system is in a low power mode, conducts a verification that code to perform the boot is uncorrupted, and negotiates an increased power delivery with a source device connected to the computing system if the verification is successful.

Discussion in the ATmosphere

Loading comments...