{
  "$type": "site.standard.document",
  "description": "A battery connection unit includes a first branch with a first branch switch adapted to connect a first battery to at least one of a second battery and a vehicle load; and a second branch with a second branch switch connected in parallel with the first branch. A first measurement switch is…",
  "path": "/patents/1302728",
  "publishedAt": "2021-10-21T00:00:00.000Z",
  "site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
  "tags": [
    "G01R31/52",
    "LEAR CORPORATION"
  ],
  "textContent": "A battery connection unit includes a first branch with a first branch switch adapted to connect a first battery to at least one of a second battery and a vehicle load; and a second branch with a second branch switch connected in parallel with the first branch. A first measurement switch is connected between the first branch and a storage element to enable/disable charging. A second measurement switch is connected between the second branch and the storage element. A processor is programmed to: disable at least one of the first branch and the second branch; enable at least one of the first measurement switch and the second measurement switch to charge the storage element with leakage current; and generate an output signal indicative of a switch fault in response to a storage element voltage associated with the leakage current exceeding a reference voltage within a predetermined time period.",
  "title": "LEAKAGE CURRENT MONITORING SYSTEM"
}