"description": "A method for operating a gas turbine assembly for power plant, in particular a method for restoring a grid after a blackout by means a gas turbine assembly for power plant; the method comprising the steps of:a) providing a sequential gas turbine assembly comprising a in series a first combustor…",
"path": "/patents/1409047",
"publishedAt": "2026-01-28T00:00:00.000Z",
"site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
"tags": [
"F01D19/02",
"ANSALDO ENERGIA SWITZERLAND AG [CH]"
],
"textContent": "A method for operating a gas turbine assembly for power plant, in particular a method for restoring a grid after a blackout by means a gas turbine assembly for power plant; the method comprising the steps of:a) providing a sequential gas turbine assembly comprising a in series a first combustor assembly and a second combustor assembly;b) operating the first combustor in idle/house load use until the inlet air temperature of the second combustor reaches a threshold;c) operating the second combustor in idle/house load used) switching the gas turbine assembly in consumer use",
"title": "METHOD FOR SUPPORTING A BLACK GRID RESTORATION BY USING A GAS TURBINE WITH SEQUENTIAL COMBUSTORS"
}