POWER MANAGEMENT SYSTEM, SERVER, AND POWER SUPPLY AND DEMAND ADJUSTMENT METHOD

DRIVE April 1, 2026
Source
A power management system (100) includes a plurality of power adjustment resources electrically connected to a microgrid (MG), and a CEMS server (2) that manages the plurality of power adjustment resources. The plurality of power adjustment resources include a plurality of FCEVs (9) that supply electric power to the microgrid (MG). Each of the plurality of FCEVs (9) executes a refresh process that removes an oxide film formed on a catalyst electrode of an FC stack (906) by causing the FC stack (906) to generate electric power exceeding prescribed electric power. The CEMS server (2) adjusts execution timings of the refresh process in the plurality of FCEVs (9) during power supply to the microgrid (MG), so as to respond to a request to adjust power supply and demand in the microgrid (MG).