BUILDING CONTROL SYSTEM USING REINFORCEMENT LEARNING

DRIVE January 27, 2022
Source
A method of operating a building management system is disclosed. The method includes determining, by a processing circuit, policy rankings for a plurality of control policies based on building operation data of a first previous time period, selecting, by the processing circuit, a set of control policies from among the plurality of control policies based on the policy rankings of the set of control policies satisfying a ranking threshold, generating, by the processing circuit, a plurality of prediction models for the set of control policies, selecting, by the processing circuit, a first prediction model of the plurality of prediction models based on building operation data of a second previous time period, and responsive to selecting the first prediction model, operating, by the processing circuit, the building management system using the first prediction model.

Discussion in the ATmosphere

Loading comments...