CONTROL OF A RENEWABLE ENERGY POWER PLANT TO RESUME NORMAL OPERATION FOLLOWING A FAULT

DRIVE February 24, 2022
Source
There is provided a method for operating a renewable energy power plant comprising a plurality of renewable energy generators, the method comprising: calculating a rate of change of reactive power reference level for transitioning between a present reactive power reference level, output by a reactive power controller, and a target reactive power reference level, the target reference level being suitable for normal operation of the renewable energy power plant; and, following a fault on a power network to which the renewable energy power plant is connected, dispatching a control signal for controlling the renewable energy power plant to generate or consume reactive power at the calculated rate of change to transition the reactive power level of the renewable energy power plant to the target reactive power reference level.

Discussion in the ATmosphere

Loading comments...