{
"$type": "site.standard.document",
"description": "A period for performing pre-power-supply check prior to main power supply from a power supply device to a power reception device is provided and, a power-receiving-side controller is configured to: check a supplied electric power supplied from the power supply device to the power reception deviceā¦",
"path": "/patents/1313440",
"publishedAt": "2022-03-17T00:00:00.000Z",
"site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
"tags": [
"H02J50/12",
"DENSO CORPORATION"
],
"textContent": "A period for performing pre-power-supply check prior to main power supply from a power supply device to a power reception device is provided and, a power-receiving-side controller is configured to: check a supplied electric power supplied from the power supply device to the power reception device, in a state where an effective value of an output voltage of a inverter circuit is fixed to a predetermined first voltage by the power-supply-side controller and an input voltage of the DC-DC converter is fixed to a predetermined second voltage by the power-receiving-side controller, in the pre-power-supply check, and cause, in response to the supplied electric power being equal to a predetermined electric power or more, the power supply device to start the main power supply.",
"title": "DYNAMIC POWER SUPPLY SYSTEM"
}