ELECTRICITY METER PRIMARY ENERGY HOLDUP MANAGEMENT

DRIVE June 16, 2022
Source
A utility meter includes: a rectifier configured to rectify AC voltage from a power grid to generate a primary DC voltage supply; and a primary holdup circuitry, including: first capacitors coupled to a primary DC voltage rail and configured to store energy from the primary voltage supply; a switch coupled to the first capacitors; and a control circuit configured to control the primary holdup circuitry, wherein the control circuit is configured to: determine that a secondary DC voltage of a secondary voltage supply is approximately equal to a first specified threshold voltage; and generate a control signal to causes the switch to turn on and cause the one or more first capacitors to release a portion of the energy stored in the one or more first capacitors to the primary DC voltage rail.

Discussion in the ATmosphere

Loading comments...