{
  "$type": "site.standard.document",
  "description": "To allow creating an efficient battery operation plan while considering uncertainties of a farm work time or the like caused by weather fluctuation. A battery operation plan creation system 10 creates an operation plan for a plurality of batteries 5 charged at a nano-grid 1 including at least one…",
  "path": "/patents/1395689",
  "publishedAt": "2026-04-08T00:00:00.000Z",
  "site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
  "tags": [
    "B60L53/51",
    "HITACHI LTD [JP]"
  ],
  "textContent": "To allow creating an efficient battery operation plan while considering uncertainties of a farm work time or the like caused by weather fluctuation. A battery operation plan creation system 10 creates an operation plan for a plurality of batteries 5 charged at a nano-grid 1 including at least one of a power generation facility or an electricity storage facility. The battery operation plan creation system 10 inputs a work plan including a work demand for the battery 5 required for a work in a farmland 2 and demand area weather information indicating a weather of the farmland 2; and creates the operation plan for the plurality of batteries 5 in the farmland 2 based on the input work plan and demand area weather information.",
  "title": "INFORMATION PROCESSING APPARATUS, ENERGY SYSTEM, AND BATTERY OPERATION PLAN CREATION METHOD"
}