POWER CONSUMPTION MONITORING AND OPTIMIZATION
DRIVE
January 21, 2026
Monitoring method, using an electricity meter (1) arranged to measure electrical consumption of an installation (3) and comprising a current limiter (20) arranged to selectively limit a current supplied to the installation, the monitoring method comprising the steps, repeated each current day, for each current period of a predetermined set of at least one successive period defined in the current day, of: - verifying a first predetermined condition associated with said current period; - if the first predetermined condition is verified, activating the current limiter to limit the current supplied to the installation until the end of said current period.
Discussion in the ATmosphere