  "$type": "site.standard.document",
  "description": "A battery bank unit includes: a first battery bank and a second battery bank that are connected in parallel to each other; and a control apparatus that starts charging the second battery bank after the first battery bank is fully charged. The control apparatus calculates remaining time to complete…",
  "path": "/patents/1343083",
  "publishedAt": "2023-05-11T00:00:00.000Z",
  "site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
  "tags": [
    "H02J7/0049",
    "FDK CORPORATION"
  ],
  "textContent": "A battery bank unit includes: a first battery bank and a second battery bank that are connected in parallel to each other; and a control apparatus that starts charging the second battery bank after the first battery bank is fully charged. The control apparatus calculates remaining time to complete charge of the battery bank unit based on a temperature of the battery bank unit at a start of the charge of the battery bank unit and a state of charge (SOC) of at least one of the first battery bank and/or the second battery bank at the start of the charge of the battery bank unit.",
  "title": "BATTERY BANK UNIT, REMAINING CHARGE TIME CALCULATION METHOD, AND REMAINING CHARGE TIME CALCULATION PROGRAM"
}