CHARGING AND DISCHARGING CONTROL OF ENERGY DEVICES IN A POWER SYSTEM

DRIVE May 18, 2023
Source
A control switch incorporating a 1:2 demultiplexer is used to control timing for a concurrent switching, break-before-make and make-before-break power multiplexing, and is configurable to link a plurality of the control switches into a control chain to perform sequential charging, sequential discharging, parallel charging, parallel discharging, and concurrent sequential charging and discharging for a plurality of batteries coupled to the control chain in a power system.

Discussion in the ATmosphere

Loading comments...