A method described delivers power to a first load and a second load from networked power plants. The method may include receiving a power delivery profile for the first load, receiving a power delivery profile for a second load, determining a power output capability of a first renewable energy power plant (REPP), and determining a power output capability of a second REPP. The method may also include setting a power output for the first REPP and a power output for the second REPP based on the power delivery profile for the first and second loads and the power output capabilities of the first and second REPPs. The method may also include allocating a combined power output of the first and second REPPs to the first and second loads and delivering the allocated combined power output to the first and second loads.