{
  "$type": "site.standard.document",
  "description": "The device has an electrical connection for connection to an alternating current (AC) supply system. The control device determines beginning and end of a control period within a common cycle period before beginning of the control period such that a force curve (74) without optimization and a force…",
  "path": "/patents/969312",
  "publishedAt": "2014-10-01T00:00:00.000Z",
  "site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
  "tags": [
    "H02J1/14",
    "ABB TECHNOLOGY AG [CH]"
  ],
  "textContent": "The device has an electrical connection for connection to an alternating current (AC) supply system. The control device determines beginning and end of a control period within a common cycle period before beginning of the control period such that a force curve (74) without optimization and a force curve (78) with optimization are optimized by loads to constant curves during the cycle period. The control device determines and considers a total duration, which is equal to discontinuous block periods, instead of the continuous control period during optimization for the loads. An independent claim is also included for a method for controlling an energy distribution system.",
  "title": "Control device for an energy distribution system and method for controlling an energy distribution system"
}