{
  "$type": "site.standard.document",
  "description": "The method involves providing extrapolation rule and extrapolated time associated with intended value of a master sensor to be predetermined on basis of the extrapolation rule. A first synchronization signal is transmitted to a slave sensor when the extrapolated time occurs and delay time different…",
  "path": "/patents/970829",
  "publishedAt": "2014-08-27T00:00:00.000Z",
  "site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
  "tags": [
    "G01B11/002",
    "HEXAGON TECHNOLOGY CT GMBH [CH]"
  ],
  "textContent": "The method involves providing extrapolation rule and extrapolated time associated with intended value of a master sensor to be predetermined on basis of the extrapolation rule. A first synchronization signal is transmitted to a slave sensor when the extrapolated time occurs and delay time different from the extrapolated time in a temporally defined manner occurs. Recording of slave sensor value is triggered by a first synchronization signal. The intended value and the slave sensor value are provided as connected value tuple. An independent claim is also included for a sensor measuring system.",
  "title": "Sensor synchronisation method and corresponding sensor measuring system"
}