{
  "$type": "site.standard.document",
  "description": "In some aspects, techniques may include monitoring a primary load of a datacenter and a reserve load of the datacenter. The primary load and reserve load can be monitored by a computing device. The primary load of the datacenter can be configured to be powered by one or more primary generator…",
  "path": "/patents/1361479",
  "publishedAt": "2024-03-28T00:00:00.000Z",
  "site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
  "tags": [
    "G06F9/5094",
    "Oracle International Corporation"
  ],
  "textContent": "In some aspects, techniques may include monitoring a primary load of a datacenter and a reserve load of the datacenter. The primary load and reserve load can be monitored by a computing device. The primary load of the datacenter can be configured to be powered by one or more primary generator blocks having a primary capacity, and the reserve load of the datacenter can be configured to be powered by one or more reserve generator blocks having a reserve capacity. Also, the techniques may include detecting that the primary load of the datacenter exceeds the primary capacity. In addition, the techniques may include connecting the reserve generator blocks to at least one of the primary generator blocks and the primary load using a computing device switch.",
  "title": "BURST DATACENTER CAPACITY FOR HYPERSCALE WORKLOADS"
}