{
  "$type": "site.standard.document",
  "description": "An REPP may include a renewable energy source (RES), a first meter associated with a first load, a second meter associated with a second load, a first ESS electrically coupled to the RES and the first meter, a second ESS electrically coupled to the RES and the first meter through a switch, and a…",
  "path": "/patents/1362124",
  "publishedAt": "2024-04-11T00:00:00.000Z",
  "site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
  "tags": [
    "H02J3/381",
    "8me Nova, LLC"
  ],
  "textContent": "An REPP may include a renewable energy source (RES), a first meter associated with a first load, a second meter associated with a second load, a first ESS electrically coupled to the RES and the first meter, a second ESS electrically coupled to the RES and the first meter through a switch, and a controller configured to set a first charge/discharge for the first ESS and a second charge/discharge for the second ESS such that the REPP delivers power to the first load longer than the RES produces power, in response to a trigger condition, actuate the switch such that the second ESS is electrically coupled to the second meter, and set a fourth charge/discharge for the second ESS such that the second ESS maintains a portion of its charge in reserve for the second load.",
  "title": "SEASONAL ELECTRICAL RESOURCE ALLOCATION"
}