Generator management system that selectively cuts off fuel to a generator to add a load to a bus
DRIVE
January 8, 2014
Some embodiments relate to an example generator management system. The generator management system includes a first generator having a first set of power leads and a second generator having a second set of power leads. The generator management system further includes a bus that connects the first output and the second output. A controller selectively cuts off fuel to the second generator to add a load to the bus. It should be noted that embodiments are contemplated where the generator management system alternatively cuts off fuel to the first generator to add a load to the bus.
Discussion in the ATmosphere