CHARGER, CHARGING SYSTEM, AND CHARGING METHOD

DRIVE January 8, 2014
Source
A completion time setting section sets a completion time that is a time at which charging of a secondary battery is completed. An output current measurement section acquires an output value of a current from a natural energy power supply apparatus. A power amount measurement section acquires an amount of power that is supplied until the charging of the secondary battery is completed. A predicted time calculation section calculates a time at which the charging of the second battery is completed by only the natural energy power based on the output value and the power amount as a predicted time. A control section causes the secondary battery to be charged with only the natural energy power when the predicted time is earlier than the completion time.

Discussion in the ATmosphere

Loading comments...