{
"$type": "site.standard.document",
"description": "Disclosed is a sound absorption and load bearing integrated structure and a preparation method thereof. The sound absorption and load bearing integrated structure comprises of a first connecting node and a holed hollow rod connected to the first connecting node. The first connecting node is of a…",
"path": "/patents/1369202",
"publishedAt": "2024-09-19T00:00:00.000Z",
"site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
"tags": [
"B60R13/08",
"Tongji University"
],
"textContent": "Disclosed is a sound absorption and load bearing integrated structure and a preparation method thereof. The sound absorption and load bearing integrated structure comprises of a first connecting node and a holed hollow rod connected to the first connecting node. The first connecting node is of a solid structure, and the connecting portion of the first connecting node and the holed hollow rod is in smooth transition by means of a cambered surface. The first connecting node and the holed hollow rod form a sound absorption unit. The holed hollow rod of one sound absorption unit extends forwards from an axial direction of the first connecting node, and extends to be connected to a first connecting node of another sound absorption unit, or extends to be intersected with a holed hollow rod of another sound absorption unit so as to form a second connecting node.",
"title": "Sound Absorption and Load Bearing Integrated Structure and Preparation Method Thereof"
}