"description": "A method for constructing a fixed monitoring pile for a mining area with a high phreatic water level includes: S: prefabricating a pile foundation body, where the pile foundation body has a columnar structure, and a plurality of extension connection ports are provided at an outer side and a bottom…",
"path": "/patents/1369859",
"publishedAt": "2024-10-03T00:00:00.000Z",
"site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
"tags": [
"E02D5/30",
"PING AN COAL MINING ENGINEERING TECHNOLOGY RESEARCH INSTITUTE CO., LTD"
],
"textContent": "A method for constructing a fixed monitoring pile for a mining area with a high phreatic water level includes: S: prefabricating a pile foundation body, where the pile foundation body has a columnar structure, and a plurality of extension connection ports are provided at an outer side and a bottom of the pile foundation body; and S: digging a foundation pit at a designated monitoring point; combining the pile foundation body with an extension body to form a fixed monitoring pile; placing the fixed monitoring pile into the foundation pit, such that a bottom extension body and a side extension body are inserted into the pit foundation; and backfilling and compacting. The method increases the affinity between the fixed monitoring pile and a loose layer and strengthens the fixed monitoring pile to prevent it from loosening, thereby improving measurement accuracy.",
"title": "METHOD FOR CONSTRUCTING FIXED MONITORING PILE FOR MINING AREA WITH HIGH PHREATIC WATER LEVEL"
}