{
  "$type": "site.standard.document",
  "description": "A system for controlling power distribution between a renewable energy source (RES) that generates electrical power, a power grid, an energy storage system (ESS) coupled to and configured to store electrical power from the RES and the power grid, and a behind-the-meter (BTM) load coupled to and…",
  "path": "/patents/1370500",
  "publishedAt": "2024-10-24T00:00:00.000Z",
  "site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
  "tags": [
    "G05B13/04",
    "8ME NOVA, LLC"
  ],
  "textContent": "A system for controlling power distribution between a renewable energy source (RES) that generates electrical power, a power grid, an energy storage system (ESS) coupled to and configured to store electrical power from the RES and the power grid, and a behind-the-meter (BTM) load coupled to and configured to receive electrical power from the RES, the ESS, and the power grid includes a controller. The controller includes a processor and a non-transitory computer readable storage medium comprising instructions stored thereon that, upon execution by the processor, cause the controller to determine a prioritization mode and control the flow of electrical power in the system based on the prioritization mode.",
  "title": "APPLICATION FOR PRIORITY-SWITCHING DUAL-USE RENEWABLE POWER PLANT"
}