Enhanced plant level support of grid reconstruction after blackout
DRIVE
May 23, 2012
Methodology is provided for enhancing plant 200 level support for grid reconstruction following a blackout. A plant 200 based grid reconstruction manager develops solutions for reconstruction sequence steps to be carried out automatically or to be communicated to site personnel for manual implementation. The sequence steps are based on high-fidelity modeling of the capabilities all of the power production units present in a power plant 200 and take into consideration grid specified load expectations, ambient conditions including ambient temperature and gas turbine operating levels. The methodology also provides for consideration of possible subsequent steps in the sequence to maximize the ability to pick-up additional load in such subsequent steps.