{
"$type": "site.standard.document",
"description": "The system has load switching devices (LS1, LS2) including a time row unit (ZEb) and a profile unit (PEb) with sub quantities (PGb, PUb) of profile groups (PGa) and profile sub groups (PUa) of a load manager (LM). All consumers (V11-V62) of same consumer types (V1-V6) are combined within each…",
"path": "/patents/1003881",
"publishedAt": "2012-03-28T00:00:00.000Z",
"site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
"tags": [
"H02J3/0075",
"LANDIS & GYR EUROP AG [CH]"
],
"textContent": "The system has load switching devices (LS1, LS2) including a time row unit (ZEb) and a profile unit (PEb) with sub quantities (PGb, PUb) of profile groups (PGa) and profile sub groups (PUa) of a load manager (LM). All consumers (V11-V62) of same consumer types (V1-V6) are combined within each profile group. The consumers of the same consumer types with each profile group are distinguished into a number of other profile sub groups and activated or deactivated for time rows (ZZb) of the load switching device. The time rows are associated to corresponding profile sub groups. An independent claim is also included for a load-management method for controlling and load regulating electrical consumers.",
"title": "Load management system and load management method for electricity users"
}