{
"$type": "site.standard.document",
"description": "A charge control device includes: a communication unit that receives a first instruction for setting a charging wait period, which is a period for waiting the charging operation by the battery charger, and a second instruction for setting a charging period, which is a period for executing theā¦",
"path": "/patents/1004737",
"publishedAt": "2012-02-29T00:00:00.000Z",
"site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
"tags": [
"B60L53/00",
"MITSUBISHI MOTORS CORP [JP]"
],
"textContent": "A charge control device includes: a communication unit that receives a first instruction for setting a charging wait period, which is a period for waiting the charging operation by the battery charger, and a second instruction for setting a charging period, which is a period for executing the charging operation; a first timing unit that starts first timing operation for calculating a remaining charging wait period, which is a remaining period of the charging wait period, by subtracting an elapsed period from the charging wait period; a charging start unit that allows the battery charger to start the charging operation when the remaining charging wait period becomes zero; a second timing unit that starts second timing operation, together with start of the charging operation, for calculating a remaining charging period, which is a remaining period of the charging period, by subtracting an elapsed period from the charging period; and a charging stop unit that allows the battery charger to stop the charging operation when the remaining charging period becomes zero.",
"title": "Charge control device"
}