CONSTRUCTION GRADING STICK AND METHOD THEREFOR
DRIVE
April 23, 2026
A construction grading stick includes a housing, a reservoir, a dispenser, and a button. The housing is elongated. The reservoir is positioned in the housing and is designed to hold a supply of marking material. The dispenser is positioned at a lower portion of the housing. The dispenser is connected to the reservoir to dispense marking material from the reservoir. The dispenser including a dispensing orifice positioned in a bottom end surface of the housing perpendicular to a longitudinal axis of the housing. The button is positioned at an upper portion of the housing. The button is connected to the dispenser to permit selective activation of the dispenser to dispense marking material out through the dispensing orifice and onto a surface on which the construction grading stick is vertically held.
Discussion in the ATmosphere