{
  "$type": "site.standard.document",
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreigl7ifgagv7sfw6ffm466322mpgduls43uqarpj2lkqvdcfechnyq"
    },
    "mimeType": "image/png",
    "size": 84262
  },
  "description": "Disclosed is a working machine capable of preventing damage to a filter due to excessive accumulation of PM, even under a situation that requires, prior to compulsory regeneration of the filter, moving the machine to a place in which to perform regeneration work. The working machine that includes…",
  "path": "/patents/1016048",
  "publishedAt": "2011-02-02T00:00:00.000Z",
  "site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
  "tags": [
    "F01N3/023",
    "HITACHI CONSTRUCTION MACHINERY [JP]"
  ],
  "textContent": "Disclosed is a working machine capable of preventing damage to a filter due to excessive accumulation of PM, even under a situation that requires, prior to compulsory regeneration of the filter, moving the machine to a place in which to perform regeneration work. The working machine that includes an exhaust treatment device 4 having a filter 6 to trap particulate matter (PM), a regeneration control section 31 for compulsorily regenerating the filter, and a regeneration instruction device 23 for instructing the regeneration control section 31 to start the compulsory regeneration, further includes: an element 35 for estimating an actual quantity of PM deposited, A; an element 36 in which a reference quantity of deposition, B, is stored; an element 37 for estimating a movement-associated quantity of PM deposition, C, the quantity of PM likely to be deposited during movement of the working machine to the place of regeneration; an element 39 for determining whether the actual PM deposition quantity A estimated by the actual-deposition quantity estimating element has reached a deposition alarm level D derived by subtracting the movement-associated PM deposition quantity C from the reference deposition quantity B; and an alarm device 12 that upon the deposition quantity estimating element's determining that the actual PM deposition quantity A has reached the deposition alarm level D, notifies to an operator that a time has come to start the movement of the working machine to the place of regeneration.",
  "title": "Working machine"
}