HARVESTING PATH PLANNING SYSTEMS AND METHODS
DRIVE
January 15, 2026
One or more techniques and/or systems are disclosed for improving harvesting productivity, such as by harvesting path planning. This includes determining a harvest productivity for a plurality of areas of a field and determining off site transport availability for offloading and transport of the harvested crop for one or more harvester vehicles harvesting the field. Harvest productivity determination can be performed for the one or more harvester vehicles based on current and historical data for the plurality areas of the field, and the availability of vehicles for off site transport can be identified. Based on the productivity and the availability of vehicles, one or more predictive paths for the harvester are identified, and may be adjusted in response to changes in transport availability and/or changing site conditions.
Discussion in the ATmosphere