{
"$type": "site.standard.document",
"description": "A railway vehicle operation-control system includes at least one central processing unit being connected to a plurality of devices, which are connected in parallel, via information communication means, the plurality of the devices having at least one operational state-monitoring function which…",
"path": "/patents/1100675",
"publishedAt": "2002-10-30T00:00:00.000Z",
"site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
"tags": [
"B60L15/38",
"HITACHI LTD [JP]"
],
"textContent": "A railway vehicle operation-control system includes at least one central processing unit being connected to a plurality of devices, which are connected in parallel, via information communication means, the plurality of the devices having at least one operational state-monitoring function which transmits information on operational states of each device to the central processing unit; wherein a total controlled-variable necessary for the system is attained by allocating the total control variable to each device based on operational states determined from results of monitoring performed by the operational state-monitoring function, and a performance margin which is defined as a difference between a permissible power-output value and a current power-output value for each device while monitoring and reflecting the performance margin of each device.",
"title": "Railway vehicle operation-control system and a railway vehicle using the operation control system"
}