Configuration of a control system of an electrical installation
DRIVE
March 27, 2002
According to the method a primary device model represents the primary devices of the switching plant and a topology model the switching plant. In a first step a conduction system function is allocated to a first primary device in the primary device model. Secondly a conduction system function is allocated to a first conduction device in the function model. Following the first assignment subsequent system functions are assigned automatically using the topology model. An Independent claim is made for a computer program for modeling the configuration of an electrical switching plant.
Discussion in the ATmosphere