  "$type": "site.standard.document",
  "description": "A first series of current pulses is applied to the battery so that the electrolyte is stirred and ready for a second series which are used for measurement. The current pulses are limited to a peak (IMAX) related to the battery capacity and the pulse slope is between 20-40 Amps/sec. Battery voltages…",
  "path": "/patents/1106559",
  "publishedAt": "2002-02-20T00:00:00.000Z",
  "site": "at://did:plc:oql6ds5vnff4ugar6rruliwd/site.standard.publication/3mn3ohu7oxx5w",
  "tags": [
    "G01R31/3648",
    "HAWKER SA [FR]"
  ],
  "textContent": "A first series of current pulses is applied to the battery so that the electrolyte is stirred and ready for a second series which are used for measurement. The current pulses are limited to a peak (IMAX) related to the battery capacity and the pulse slope is between 20-40 Amps/sec. Battery voltages are measured at initial and subsequent current zeros and also at points (u1,u2) on the pulse slope. Independent claims are made for: (1) a regulator; (2) a generator; (3) a method for measuring pulse slope.",
  "title": "Test method of a lead battery in order to charge it in optimal conditions"
}