{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreigt2djtwtxfekxwq4mit2vtq2u6wip6bpknozhbzi7raiuq55hxue",
    "uri": "at://did:plc:oiokqdfjz4ivqojfpkojv6sy/app.bsky.feed.post/3mnmscqejnlq2"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreie7dzlbvcgvcc62uqc22zys64z2oshkk7r7tixlopjpugps4v5qh4"
    },
    "mimeType": "image/png",
    "size": 23105
  },
  "description": "Today’s briefing covers the CAISO’s $6.7 billion transmission plan, PG&E’s latest data-center interconnection agreements, the CPUC’s revised 2026 Avoided Cost Calculator proposal, four draft resolutions setting stricter standards for Demand Response, and a utility report on Vehicle-Grid Integration.\n\nThe common thread is load growth: California is building wires, repricing DER value, testing large-load cost protections, and asking whether flexible demand resources are actually dependable enou...",
  "path": "/saturday-briefing-californias-load-growth-problems-are-showing-up-everywhere/",
  "publishedAt": "2026-06-06T13:50:44.000Z",
  "site": "https://www.calregulatory.com",
  "tags": [
    "Subscribe now"
  ],
  "textContent": "Today’s briefing covers the CAISO’s $6.7 billion transmission plan, PG&E’s latest data-center interconnection agreements, the CPUC’s revised 2026 Avoided Cost Calculator proposal, four draft resolutions setting stricter standards for Demand Response, and a utility report on Vehicle-Grid Integration.\n\nThe common thread is load growth: California is building wires, repricing DER value, testing large-load cost protections, and asking whether flexible demand resources are actually dependable enough to count.\n\n* * *\n\n### This post is for subscribers only\n\nBecome a member to get access to all content\n\nSubscribe now",
  "title": "SATURDAY BRIEFING: California's Load Growth Problems are Showing Up Everywhere",
  "updatedAt": "2026-06-06T13:50:43.803Z"
}