{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreig5wwymal4g6wa3sesrlw6ibuevz2oc4r3q4uqsnnj6g45y7ngsaq",
    "uri": "at://did:plc:oiokqdfjz4ivqojfpkojv6sy/app.bsky.feed.post/3mmc6aooxuav2"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreidlkba4n2b3lrtcgcgprcqbigfivo46fbvydpfqff7mrinmoh6nsa"
    },
    "mimeType": "image/png",
    "size": 36838
  },
  "description": "The CAISO filed its Final 2027 Flexible Capacity Needs Assessment at the CPUC on May 13, providing the technical basis for flexible capacity obligations in the 2027 RA compliance year.",
  "path": "/the-caisos-2027-flexible-capacity-filing-solar-drives-84-of-the-ramp-battery-efc-methodology-unresolved/",
  "publishedAt": "2026-05-20T15:00:02.000Z",
  "site": "https://www.calregulatory.com",
  "tags": [
    "Final 2027 Flexible Capacity Needs Assessment",
    "Subscribe now"
  ],
  "textContent": "The CAISO filed its Final 2027 Flexible Capacity Needs Assessment at the CPUC on May 13, providing the technical basis for flexible capacity obligations in the 2027 RA compliance year.\n\n### This post is for subscribers only\n\nBecome a member to get access to all content\n\nSubscribe now",
  "title": "The CAISO's 2027 Flexible Capacity Filing: Solar Drives 84% of the Ramp, Battery EFC Methodology Unresolved",
  "updatedAt": "2026-05-20T15:00:02.386Z"
}