{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreib6agour3y7kbi5s4yngtuir5tipco3c37ag2yhibsoxov2ndcgia",
    "uri": "at://did:plc:oiokqdfjz4ivqojfpkojv6sy/app.bsky.feed.post/3mm7fgcqlwx42"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreie6qkn3fs5ds7exphf4awldkuu7w6xousg275qhs64ssrzx5wuzgq"
    },
    "mimeType": "image/png",
    "size": 42752
  },
  "description": "On May 15, parties served direct testimony in A.25-09-014, the SoCalGas/SDG&E 2027 CAP filing, which will allocate natural gas costs and set rates, effective January 1, 2027 through December 31, 2029.\n\nParties' testimony spans:\n\n * Storage cost classification and allocation;\n * The Sempra Utilities' proposed backbone-to-local transmission reallocation;\n * Weather-design methodology;\n * BTS nomination and open-season capacity;\n * Regulatory account treatment of the Firm Access and Storage Righ...",
  "path": "/intervenor-cap-testimony-parties-challenge-cost-allocation-bts-capacity-cuts-and-storage-proposals/",
  "publishedAt": "2026-05-19T12:30:07.000Z",
  "site": "https://www.calregulatory.com",
  "tags": [
    "A.25-09-014",
    "Subscribe now"
  ],
  "textContent": "On May 15, parties served direct testimony in A.25-09-014, the SoCalGas/SDG&E 2027 CAP filing, which will allocate natural gas costs and set rates, effective **January 1, 2027** through **December 31, 2029.**\n\nParties' testimony spans:\n\n  * Storage cost classification and allocation;\n  * The Sempra Utilities' proposed backbone-to-local transmission reallocation;\n  * Weather-design methodology;\n  * BTS nomination and open-season capacity;\n  * Regulatory account treatment of the Firm Access and Storage Rights Memorandum Account and Noncore Storage Balancing Account;\n  * A proposed Rule 23 expansion; and\n  * SoCalGas's proposal to quadruple the residential fixed charge.\n\n\n\n### This post is for subscribers only\n\nBecome a member to get access to all content\n\nSubscribe now",
  "title": "Intervenor CAP Testimony: Parties Challenge Sempra Utilities' Cost-Allocation, BTS Capacity Cuts, and Storage Proposals",
  "updatedAt": "2026-05-19T12:30:07.397Z"
}